Ashford Conservatories

Maidstone Area

Building Regulations were required on this construction, because we
removed the Kitchen wall, installed 4.900 metre length Steel Lintle,
which the new construction intergrated with the Kitchen and became
totally open plan

The Beginning

Building Regulations, and the Building Inspector, played a major role during this construction

The Footings

One metre Footing Required, and a new soakaway

Concrete Footing

The width and depth, had to be checked and Inspected

Drainage

New drainage was laid to accommodate rainwater

Concrete Base

Damproof Membrane, 100mm Celetex Insulation, Concrete Float Floor

The Walls are Rising

100mm Cavity Insulated walls

Catnic Lintles

Three Catnics were used over a single door, The high windows, and the Bi-Fold Doors

Breakthough

Not Yet, But getting prepared, for a 4.900 metre Steel Lintle,

Doorway

The Bi-Fold Doorway is taking shape

The Timber Roof

The Builders, have departed, and the Carpenters have
started.

The Roof

Most of the Timber Beams are installed.

Glass Fibre Roof Installed

Hottest Day of The Year,

Roof Framework

Aluminium Bars

Bi-Fold Doors

Installation of a four pane Bi-Fold Door, with a single
transit door to right.

Internal View


The End is in Sight


Blue Sky and Light


Plastering the Kitchen Ceiling


Roof Blinds


Floral Wallpaper Design


Single Door to Enclosed Hall


Door Blinds